Installation Checklist (Continued)
Artemis Parameters
Check
Requirement
Checked
(Initial)
Notes / Settings
DP string type as required by DP supplier.
Supplier:
DP feed protocol correctly set (baud rate, stop bits etc).
Sensor communications set correctly per installation.
End limits set correctly.
Station type set correctly (Fixed, Mobile or Beacon).
Bearing offset set (mobile station only).
Azimuth reference set (fixed station only).
Protect configuration set.
Auto recovery set.
Remote station parameters entered as required.
Function and Acceptance
Check
Requirement
Checked
(Initial)
Notes / Settings
System operation confirmed with a remote station.
Artemis system enabled in the DP system and operational to the satisfaction of the captain.
Ship’s crew introduced to the basic operation of the system and the Operator’s Guide.
Installation checked and approved by:
Printed: ...................................................................................
Signature: ................................................................................
Date: .....................................................
52
Summary of Contents for Artemis Mk6
Page 54: ......