Artemis Sensor Serial No.
Control PC Serial No.
Shipping Line
Vessel Name
Installer
Mechanical
Check
Requirement
Checked
(Initial)
Notes / Settings
Sensor
Line of sight to expected remote stations.
Required space around and below the sensor.
All external connections secure and waterproofed.
The sensor is not in close proximity to other sources of high power X-band and S-band radar.
Interface box correctly sealed and tightened (if fitted).
Sensor correctly secured to mounting.
Control PC
Correctly located and fastened.
Cables correctly installed and fastened.
Correctly installed, routed to avoid power cabling.
Cables
Cables fastened correctly.
Cables have service loops.
Installation Checklist
Electrical
Check
Requirement
Checked
(Initial)
Notes / Settings
Sensor
Supplied by UPS (220-240 VAC, 50-60 Hz).
Cabling to control PC correctly wired.
Control PC
Supplied by UPS (100-240 VAC, 50-60 Hz for Type 3 Marine Processor;
105-125 VAC or 220-240 VAC, 50-60 Hz for Hatteland Panel PC).
Sensor connection correctly wired.
DP connection correctly wired.
Cables
Serial - capable of 38400 baud.
Ethernet – capable of 10Mbit/sec.
System
System powers up and powers down correctly.
51
Summary of Contents for Artemis Mk6
Page 54: ......