
16
Expert Power Control 1202/1292
© 2018 Gude Analog- und Digitalsysteme GmbH
Operating
port is clicked at the
Expert Power Control 1202 / 1292
, a panel with buttons to con-
trol a single port appear:
The Port icon is green when the relay is closed, or red in the open state. An additional
small clock icon indicates that a timer is active. Timer can be activated by delay, reset
or batch mode.
An activated Watchdog is represented by an eye icon. An "X" means, that the address
that should be observed, could not be resolved. Two circular arrows show a booting
status.
The ports can be switched manually with the "On" and "Off" buttons. If the port is
turned on, it can be turned off by pressing the "Reset" button, until after a delay it turns
itself on again. The delay time is determined by the parameter Reset Duration, which is
described in the chapter "Configuration - Power Ports
". The "Close" button dis-
solves the panel again.
Batchmode
Each individual port can be set for a selectable period of time to the state "switch on"
or "switch off". After the selected time they are automatically switched to the second
preselected state.
Optionally the device can be switched via a Perl script or external tools like wget. More
information is available on our support wiki at www.gude.info/wiki.
For devices with a GSM module (
Expert Power Control 1292
), additional reception in-
formation, the prepaid credit and the own call number are displayed. An overview of
the GSM activities can be expanded.
37
Summary of Contents for Expert Power Control 1202
Page 2: ...2 Expert Power Control 1202 1292 2018 Gude Analog und Digitalsysteme GmbH...
Page 6: ...Device Description...
Page 14: ...Operating...
Page 36: ...Configuration...
Page 56: ...Specifications...
Page 88: ...Support...