30
Step 3
With the gate in the
fully closed position
and the operator retracted, align the operator to the gate. Mark reference points
for bolt holes on gate cross member through middle of gate bracket slots. The operator must be level. Drill
3
/
8
" holes into
the gate cross member as marked. Fasten gate bracket to cross member using (2) 3/8" x 3" bolts, washers, lock washers, and
nuts. Attach the operator to the post bracket assembly and gate bracket using clevis pins, bushings, and hairpins clips.
Step 4
Make sure the control box power switch is
OFF
. Use a small
screwdriver to move the
Number 4
DIP switch from the factory
setting (OFF / Pull-To-Open) to
ON for Push-To-Open
. Turn
power switch
ON
. The control board is now configured to
push
the gate open.
ON
OFF
DIP#3
ON
Push-to-open operation.
OFF Pull-to-open operation (factory setting).
1
ON
2 3 4
1 2 3 4
ON
O
FF
S
O
FT
S
TA
R
T
O
FF
W
A
R
N
IN
G
O
FF
O
P
E
N
P
U
LL
S
LV
O
P
E
N
D
LY
.
M
O
D
E
1
O
FF
O
N
O
N
P
U
S
H
S
IM
U
LT
.
O
N
1
2
0
M
IN
M
A
X
A
U
TO
CL
OSE
TIME
ST
ALL FORCE
1 2 3 4
ON
O
FF
S
O
FT
S
TA
R
T
O
FF
W
A
R
N
IN
G
O
FF
O
P
E
N
P
U
LL
S
LV
O
P
E
N
D
LY
.
M
O
D
E
1
O
FF
O
N
O
N
P
U
S
H
S
IM
U
LT
.
O
N
1
2
0
M
IN
M
A
X
A
U
TO
C
LOS
E
TIME
ST
ALL FOR
C
OR
C
1 2 3 4
ON DIP
O
FF
O
FF
P
U
LL
D
LY
.
O
FF
O
FF
O
N
O
N
P
U
S
S
IM
U
O
N
O
N
1
2
0
M
IN
Level Operator
Fence Post
Clevis Pin, Bushing, and Hairpin Clip
Gate In Closed Position