NS3000 UPS 60KVA~120KVA User Manual
53
地脚
Parallel Interface
Fig.5-7 Location of the Parallel board
The control cables for the parallel operation must be connected with all single
devices to form a closed loop, as is shown in Fig.5-8.
Fig.5-8 Parallel connection
For more details of parallel operation, please refer to the “Instruction for Parallel
Operation of Tower UPS”.
Summary of Contents for NS3000 Series
Page 6: ......