
GST-M200 Intelligent Fire Alarm Control Panel
Installation and Operation Manual
Page 15
Fig. 2-3
Connect a wire from the grounding stud in the cabinet to a known solid earth ground in the
building. Refer to Fig. 2-1 for location of the stud. This connection is vital for maintaining
the control panel’s immunity to unwanted transients generated by lightning and
electrostatic discharge. Apply AC power to the panel only after the system is completely
installed and visually checked.
2.2.2 Battery Power
Before connecting the batteries to the FACP, make certain that the interconnect cable
between the batteries is not connected. Do not connect the interconnect cable until the
system is completely installed. Observe polarity when connecting the batteries.
WARNING:
Battery contains sulfuric acid, which can cause severe burns to
the skin and eyes and can destroy fabrics. If contact is made with sulfuric
acid, immediately flush the skin or eyes with water for 15 minutes and seek
immediate medical attention.
2.3 24VDC Power Output Connection
24VDC power output is Power-limited
,
supervised and regulated.
GND
24V
XT10
Power-limited
0.75A max, 24VDC nominal filtered, power
can be drawn from XT10, Terminals 1 (24V)
and 2 (GND)
Fig. 2-4
2.4 Relays (For Common Use)
The FACP provides three relays, with contacts rated 2.0A @ 30VDC (resistive).
Connector
L N G
AC Power 120V/220V
Note: Please make sure the mains power is in
line with the rated voltage marked on the
panel
’s label.
Summary of Contents for GST-M200
Page 1: ......