Geophysical Survey Systems, Inc.
PaveScan® RDM 2.0
Manual
MN36-716 Rev A
49
Appendix C – Valid Data Range
Valid Data Range
This option is found in the Project Properties as a new checkbox “Apply Valid Data Range.” When this
option is checked, a pre-selected value range is used.
The value range is specified in the screen that appears when pressing the
button.
Note, there are valid range settings for Dielectric, Percent Voids, Compaction, and Density.
Summary of Contents for PaveScan RDM 2.0
Page 1: ...MN36 716 Rev A ...
Page 4: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A ...
Page 6: ...Geophysical Survey Systems Inc PaveScan 2 0 RDM Manual ...
Page 8: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A 2 ...
Page 34: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A 28 ...
Page 46: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A 40 ...
Page 50: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A 44 ...
Page 52: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A 46 ...
Page 64: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A 58 ...
Page 66: ...Geophysical Survey Systems Inc PaveScan RDM 2 0 Manual MN36 716 Rev A 60 ...
Page 67: ......