Chapter 2: Gateway Installation
What You Should Know
The Gateway PSU must be installed in a location that has sufficient air circulation around the box.
Minimum clearance is 22" W x 27" H to ensure protection against electrical conducted noise.
NOTE:
Refer to the custom site map for the recommended PSU installation location.
1. Fasten two cable glands (31) into the pre-drilled holes in the Gateway PSU (2) enclosure.
NOTE:
These cable glands (31) can be found packaged inside of the enclosure.
Figure 2-1
Installing the cable glands to the Gateway PSU enclosure
2
Gateway PSU
31
Cable gland
2. Insert the provided ethernet cable (14) and power cable (15) through the cable glands (31) and
terminate them into the Gateway PSU PCBA terminal blocks. Refer to the
and
for proper cable mapping.
Figure 2-2
Gateway PSU PCBA terminal blocks
Table 2-1
Ethernet cable and power cable mapping details
Ethernet Cable (14)
Blue/White + Blue
+
Brown/White + Brown
-
Power Cable (15)
Black
L1
White
N
Green
Ground
16
PNEG-2347
Cable Monitoring System
Summary of Contents for GrainVue
Page 1: ...Cable Monitoring System Installation Manual PNEG 2347 Version 1 0 Date 11 01 21 PNEG 2347...
Page 4: ...NOTES 4 PNEG 2347 Cable Monitoring System...
Page 22: ...NOTES 22 PNEG 2347 Cable Monitoring System...
Page 28: ...NOTES 28 PNEG 2347 Cable Monitoring System...
Page 42: ...NOTES 42 PNEG 2347 Cable Monitoring System...
Page 50: ...NOTES 50 PNEG 2347 Cable Monitoring System...