26
PNEG-1421
Direct Gear Drive Bin Sweep Auger
INSTALLATION
11. Sweep Wheel Installation
Fig. 11
A. Insert the 4-3/8" long bushing into the flight making sure to align the outer most hole in the flight with the
hole in the bushing. Align the slot in the wheel shaft with the hole in the bushing and insert the shaft into
the bushing. Connect them all together using a 3/8" x 2-1/2" grade 8 HHCS bolt for 6" and a 3/8" x 3" grade
8 HHCS bolt for 8" & 10" along with the appropriate sized lock nut. Mount the sweep wheel to the back
shield using 3/8" x 1-3/4" HHCS bolts, flat washers, and lock nuts. Use spacers as necessary to connect
the wheel angle bracket to the back shield. (See Figure 11)
3/8"
3/8"
Summary of Contents for PNEG-1421
Page 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Page 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Page 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Page 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Page 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...