16
PNEG-1421
Direct Gear Drive Bin Sweep Auger
INSTALLATION
4. Unload Tube Installation
A. Cut an opening in the bin wall for the unloading tube to
pass through. See chart below for hole information.
Additional views of the holes can be found in Figures
4-A, 4-B, and 4-C.
Tube Size
Hole Size and Location
13" hole, approximately 6" below the bin
floor, inline with the Center Well Tube
11" hole, approximately 6-1/5" below
the bin floor, inline with the Center Well Tube
9" hole, approximately 7-1/2"below the floor,
directly inline with the Center Well Tube
10"
8"
6"
B. From inside the bin, insert the angle ring end of the
unload tube through the hole in the bin sidewall.
Fig. 4-A
(10" Tube)
Fig. 4-B
(8" Tube)
Fig. 4-C
(6" Tube)
Approx.
13"
Approx.
11"
Approx.
9"
Before installing tube, remove flight
from inside of tube.
Summary of Contents for PNEG-1421
Page 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Page 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Page 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Page 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Page 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...