![GSI Group PNEG-1421 Assembly & Operation Manual Download Page 28](http://html1.mh-extra.com/html/gsi-group/pneg-1421/pneg-1421_assembly-and-operation-manual_2275193028.webp)
28
PNEG-1421
Direct Gear Drive Bin Sweep Auger
OPERATION
13. Before Filling the Bin
Figure 13-A
Bridged grain can easily break loose and
bury a person, suffocating them.
DO NOT
enter a bin with bridged grain.
Figure 13-B
DO NOT enter the grain bin unless
all power driven equipment has
been shut down and locked out.
Never enter the grain bin unless
monitored by another person.
DO NOT enter the bin if the grain has
bridged or has flowed abnormally
out of the bin as shown in Fig. 13-A
or Fig. 13-B. Suffocation can occur if
grain suddenly breaks loose, burying
persons who are inside the bin.
Abnormal grain flow can easily fall and
bury a person, suffocating them.
DO
NOT
enter a bin with abnormal grain flow.
A. Close the center well and the intermediate well gates. Push
the control pipes to close.
B. Disengage the power sweep clutch control.
Push to disengage.
C. Position the sweep auger a long side the intermediate wells.
14. Perform Pre-start Checks
Failure to perform any or all of these pre-start checks may cause damage to the
equipment and/or cause SERIOUS INJURY or DEATH to those in the work area.
Failure to perform any or all of these pre-start checks may also be a misuse of the
equipment. Any misuse of the equipment may void the warranty.
A. Make sure ALL belts are tensioned properly.
B. Make sure ALL shields are in place and that the belt(s) and pulley(s) are able to move freely.
ALWAYS keep ALL guards and shields in place, until all the power is disconnected
and locked out.
C. Inspect the drive unit for any problems or potential problems.
D. Be aware of any emergency shutdown procedures. Two (2) people must always be in a position
where the operation of the equipment can be monitored.
E. Before starting the auger for the first time, make sure that all parts are assembled correctly
according to the instructions in this manual.
Make certain ONLY trained operators are in the work area before operating or moving
the machine. Two (2) people must always be in a position where the operation of the
equipment can be monitored.
Summary of Contents for PNEG-1421
Page 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Page 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Page 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Page 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Page 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...