![GSI Group PNEG-1421 Assembly & Operation Manual Download Page 20](http://html1.mh-extra.com/html/gsi-group/pneg-1421/pneg-1421_assembly-and-operation-manual_2275193020.webp)
20
PNEG-1421
Direct Gear Drive Bin Sweep Auger
INSTALLATION
7B. Rack & Pinion Installation
(8" & 10" Systems)
1.
Make sure all gates are fully closed.
2.
Slip Rack & Pinion tube over center gate control rod and
align holes, making sure Rack & Pinion is fully extended
toward bin wall. (See Figure 7-B)
3.
With Rack & Pinion resting on unload tube, and tube
holes aligned, insert one (1) 5/16" x 1-3/4" bolt through
the Rack & Pinion tube and center gate control rod.
Fasten together with a nut. (See Figure 7-B)
4.
Slide Wrench over shaft on Rack & Pinion, making sure
the collar faces the gears. Fasten down with 3/8" flat
washer and 3/8" x 3/4" hex bolt. (See Figure 7-C)
5.
With Rack & Pinion fully extended attach lower half
band and secure to unload tube with six (6) 5/16" x
1-1/2" bolts, washers, and Whiz nuts. (See Figure 7-D)
6.
To open all gates, with center gate closed, place second
5/16" x 1-3/4" bolt through center gate control rod and
intermediate gate control rod, and secure with nut. (See
Figure 7-D)
Fig. 7-B (8" & 10" Systems)
Center Well
Control Rod
Rack & Pinion
Rack & Pinion Tube
5/16 x 1-3/4" Bolt
Fig. 7-C (8" & 10" Systems)
Fig. 7-D (8" & 10" Systems)
Lower Half Band
5/16" x 1-1/2" Bolts
Wrench
3/8" x 3/4" Hex Bolt
Flat Washer
Rack &
Pinion
Center Well Control Rod
Intermediate Well Bolt
Intermediate
Well
Control
Rod
Summary of Contents for PNEG-1421
Page 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Page 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Page 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Page 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Page 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...