14
PNEG-1421
Direct Gear Drive Bin Sweep Auger
INSTALLATION
For bins with raised metal floors, it is necessary to cut openings in the floor for the center well and intermediate
wells. Make sure the metal floor is high enough above the concrete base so there is space for the wells. It would
be convenient to complete assembly of the bin floor as the power sweep is being installed for better access to
components under the floor.
1.
Locate the center of the bin and make a cut-out in the bin floor for the center well. See Fig. 2-A for cut-out size
and location of 6" & 8" wells. See Fig. 2-B for 10" wells. Locate the vertical shaft between the gearboxes in the
center of the bin. Place suitable supports under the center well to hold it in position.
2. Power Sweeps in Bins with Raised Metal Floors
Fig. 2-A
6" & 8" (15.24 cm 20.32 cm)
Center and Intermediate Well(s) Bin Floor Cut-Outs.
Fig. 2-B
10" (25.40 cm)
Center and Intermediate Well(s) Bin Floor Cut-Outs.
Summary of Contents for PNEG-1421
Page 37: ...37 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS PARTS SECTION...
Page 39: ...39 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Center Well Parts...
Page 45: ...45 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS 8 Rack Pinion 10 Rack Pinion 3...
Page 49: ...49 PNEG 1421 Direct Gear Drive Bin Sweep Auger PART LISTS Reduction Wheel Parts...
Page 50: ...50 PNEG 1421 Direct Gear Drive Bin SweepAuger NOTES...