22
106205_06_07_08
Revision date: 08.30.18
Front (or outside)
of the greenhouse
Square-to-
Round Tube
Connect
Bracket
Band Clamp
Position all screws, bolts
and clamps so they will
not damage end wall
panels when panels
are attached to
frame.
End Rafter
Install End Wall Frame
24. Repeat steps to attach square-to-round tube bracket to support tube.
25. Place square tube fitting on bottom of support. Align center with center
mark on base rail. Attach top to band clamp. Do not tighten.
26. Verify that frame tube is plumb and use FA4482B screws to secure
104624 tube fitting to base rail.
INSTALL END WALL FRAME — CONTINUED
Center Mark
27. Tighten top band clamp and
install a Tek screw through clamp and into
back of rafter.
Inside view
of end rafter
28. Repeat procedures as needed to assemble and install all remaining
vertical supports.
29. Return to each band clamp, 104624 fitting, and pipe splice and verify a
Tek screw is installed in each location. Install a Tek screw if needed.
30. Repeat steps as needed to install end framing for remaining end of
greenhouse frame.
31. Continue with procedures on next pages.
FA4482B