21
Revision date: 08.30.18
106205_06_07_08
17. Choose square tube for header and cut proper length.
18. Using two angle brackets, attach header tube between door jambs as
shown below.
Header
Install End Wall Frame
INSTALL END WALL FRAME — CONTINUED
19. Verify that both door jambs are plumb and recheck width of door opening
at top and bottom. Adjust if needed.
NOTE:
Do not secure door to door jambs at this time. Jambs should be
tight to door frame.
20. Use end frame diagram to determine number of remaining vertical frame
supports and place one band clamp on end rafter for each support.
21. Using end frame diagrams (Quick Start section),
measure and mark (on
base rail) the locations of remaining supports
.
ATTENTION:
If no dimensions are shown, evenly space the supports
for installation. If accessories such as fans and shutters are included,
consult those items to determine required rough openings. Frame the
remainder of the end wall as needed.
22. Choose parts for each remaining vertical support.
23. Use previous steps to measure and cut square tube for the support.
Subtract length for the square-to-round tube bracket.
81 7/8"
37 5/8"
CL -CL
NOTE: COLUMNS NOT DIMENIONED HAVE A NON-CRITICAL PLACEMENT
AND ARE USED FOR POLYCARBONATE SUPPORT.
ALL END FRAMING TUBES ARE FULL LENGTH OR CUT
FROM 1 1/2" X 1 1/2" SQUARE TUBING.
Step 20
Step 21