20
106205_06_07_08
Revision date: 08.30.18
9. Select a square-to-round tube connect bracket and attach it to one end
of door jamb. Use a 5/16" drill bit and drill to drill mounting hole through
tube. Attach bracket using nut and carriage bolt.
Install End Wall Frame
INSTALL END WALL FRAME — CONTINUED
End Rafter
Square-to-
Round Tube
Connect
Bracket–
104074
End wall as seen
from outside
building.
FAH320 Bolt &
FALB32B Nut
Door Opening
Angle Bracket
Mark
Base Rail
Center of
Door jamb
10. Use bolt in band clamp
to attach bracket to
band clamp. DO NOT
TIGHTEN AT THIS TIME.
Position bolt heads to the
outside (or front/back) of
greenhouse.
11. Repeat steps as needed to
construct remaining door
jamb and attach bracket
to top.
12. Attach second jamb to
band clamp on rafter.
13. Using marks on base rail for door,
attach bottom of door jamb to base
rail using an angle bracket (QH1330)
. Verify jamb is plumb using a level
or similar means.
14. Tighten band clamp bolt to lock first door jamb in place.
15. Take door and set it on base rail between secured vertical door jamb
and the loose door jamb. Door frame "wraps around" door jambs.
Diagram below shows typical installation.
16. Swing loose door jamb back into position tight to door frame and secure
bottom to base rail using Tek screws and QH1330 bracket.
NOTE:
Verify jamb is plumb before installing Tek screws. Adjust if
needed. Frame shown may differ slightly from actual frame.