Model G0827 (Mfd. Since 11/17)
-31-
Head Tilt
Ram Movement
Tools Needed
Qty
Knee Crank or Open-End Wrench 14mm ......... 1
Open-End Wrench 24mm .................................. 1
Moving Ram Forward/Backward
1. DISCONNECT MACHINE FROM POWER!
2. Loosen both lock handles shown in Figure 34.
3. Rotate pinion gear bolt (see Figure 34) to
move ram until spindle is in desired position.
4. Retighten lock handles to secure ram move-
ment before resuming operation.
When positioning head back to 0° after
tilting it, you will need to tram it to make
certain spindle is precisely perpendicular
to table to ensure proper milling accuracy.
Refer to Tramming Mill Head section on
Page 58 for detailed instructions.
Items Needed
Qty
Open-End Wrench 19mm .................................. 1
Open-End Wrench 24mm .................................. 1
Additional Person .............................................. 1
To tilt head:
1. DISCONNECT MACHINE FROM POWER!
2. Loosen (3) hex nuts (one on each side of
head and one underneath) that secure head
to ram (see
Figure 33).
3. With assistance from another person to sup-
port head, rotate tilting bolt until head is in
desired position.
Note: Use angle scale shown in Figure 35 as
a guide for setting tilt angle.
4. Retighten hex nuts securing head to ram
before resuming operation.
Figure 33. Head tilting controls.
Figure 35. Head tilting controls.
Head Tilt (Left/Right) ...................................90°
Ram Travel ....................................................18"
Turret or Column Swivel (Left/Right) .......180°
Tilting
Bolt
Angle
Scale
Figure 34. Ram movement controls.
Ram Lock Handles
Pinion Gear Bolt
Hex Nut
(1 of 3)
Tilting
Bolt
Angle
Scale
Hex Nut
(1 of 3)
Summary of Contents for G0827
Page 92: ......