
Page 51
TTFM 6.1 Transit Time Flow Meter
9. Sand the pipe at this position if it needs to be prepped because of scale or rust. After prepped,
move the bracket to this 1 cross mark, and tighten it in place. Apply coupling compound to the
transducers and place them in the brackets:
View from front of pipe:
View from back of pipe:
Tips for installing transducers:
a. Be sure the tightening screws on the brackets are loosened completely.
b. Put the transducer into the bracket by ensuring the bottom of the transducer and the
couplant does not touch the pipe as you slide it in (hover).
c. With the transducer hovering, tighten the screws on the bracket until tight. The transducer
will be level with the surface of the pipe, and no grease will have smeared off from
inserting the transducer in the bracket.
Summary of Contents for TTFM 6.1
Page 2: ...Note This page has been left blank intentionally ...
Page 5: ...Page 5 TTFM 6 1 Transit Time Flow Meter 100 240 VAC Meter CONNECTIONS ...
Page 27: ...Page 27 TTFM 6 1 Transit Time Flow Meter TYPICAL SENSOR INSTALLATION ...
Page 53: ...Page 53 TTFM 6 1 Transit Time Flow Meter SENSOR MOUNTING COUPLING RECOMMENDATIONS ...