
Page 33
TTFM 6.1 Transit Time Flow Meter
2 OR 4 CROSS INSTALLATION OVERVIEW - TMK-B1 Kit (Cont.)
5. Measure the separation distance from the mark you created in step 4, and create a new mark on
the pipe at the separation distance. It may be useful to mark your Greyline tape measure
(included with every meter) at the separation distance point before marking the pipe. The marked
pipe is shown below.
6. Move the non-permanent bracket to position at the mark you created at step 5, and tighten it
completely. Apply coupling compound to the transducers, and install them in the brackets.
Tips for installing transducers:
a. Be sure the red knob on the brackets are loosened completely
b. Put the transducer into the bracket by ensuring the bottom of the transducer and the
couplant does not touch the pipe as you slide it in. (Hover)
c. With the transducer hovering, tighten the red knob on the bracket until thight. The
transducer will be level with the surface of the pipe, and no grease will have smeared off.
(pictures of proper coupling application and finished installation on the next page)
Summary of Contents for TTFM 6.1
Page 2: ...Note This page has been left blank intentionally ...
Page 5: ...Page 5 TTFM 6 1 Transit Time Flow Meter 100 240 VAC Meter CONNECTIONS ...
Page 27: ...Page 27 TTFM 6 1 Transit Time Flow Meter TYPICAL SENSOR INSTALLATION ...
Page 53: ...Page 53 TTFM 6 1 Transit Time Flow Meter SENSOR MOUNTING COUPLING RECOMMENDATIONS ...