
Page 38
TTFM 6.1 Transit Time Flow Meter
6. Using the mylar sleeve included with the installation kit, wrap it around the pipe, keep it taut,
and with the Sharpie, draw a line anywhere the sleeve overlaps:
7. Lay the mylar sleeve flat, use duct tape to help hold it flat if you need to, and use the tape
measure to measure half way between the two marks created when you wrapped the mylar
around the pipe:
Summary of Contents for TTFM 6.1
Page 2: ...Note This page has been left blank intentionally ...
Page 5: ...Page 5 TTFM 6 1 Transit Time Flow Meter 100 240 VAC Meter CONNECTIONS ...
Page 27: ...Page 27 TTFM 6 1 Transit Time Flow Meter TYPICAL SENSOR INSTALLATION ...
Page 53: ...Page 53 TTFM 6 1 Transit Time Flow Meter SENSOR MOUNTING COUPLING RECOMMENDATIONS ...