
Page 49
TTFM 6.1 Transit Time Flow Meter
6. Using the mylar sleeve included with the installation kit, wrap it around the pipe, keep it taut,
and with the Sharpie, draw a line anywhere the sleeve overlaps:
7. Lay the mylar sleeve flat, and use the tape measure to measure half way between the two marks
created when you wrapped the mylar around the pipe:
Summary of Contents for TTFM 6.1
Page 2: ...Note This page has been left blank intentionally ...
Page 5: ...Page 5 TTFM 6 1 Transit Time Flow Meter 100 240 VAC Meter CONNECTIONS ...
Page 27: ...Page 27 TTFM 6 1 Transit Time Flow Meter TYPICAL SENSOR INSTALLATION ...
Page 53: ...Page 53 TTFM 6 1 Transit Time Flow Meter SENSOR MOUNTING COUPLING RECOMMENDATIONS ...