Maintenance
Page
59
of 82
8.
Maintenance
8.1 Planned maintenance
NOTICE
The following maintenance program is for general use and must be
adjusted in accordance with your specific system requirements and
conditions.
The maintenance program is based on optimum conditions and
compliance with the system specifications. Failure to comply with the
system specifications can affect how often maintenance must be carried
out on the system and its components.
Planned Maintenance Program
Description
As ne
ce
ss
ary
W
eek
ly
Mon
thly
Quar
terly
Ev
ery 6 mon
ths
Yearly
Ev
ery 2 y
ear
s
Ev
ery 3 y
ear
s
Ev
ery 4 y
ear
s
Ev
ery 5 y
ear
s
Main
tenanc
e
Instruction Numb
er
G6111 PAH sensor
Visual check
• PAH sensor
• PAH measuring chamber
x
Cleaning of PAH sensor and
measuring chamber
x
Validation of PAH sensor
x
Calibration of PAH sensor
x
PAH sensor replacement
x
G6120 Turbidity sensor
Validation of Turbidity
sensor
x
Calibration of Turbidity
sensor
x
Visual check
• Measuring chamber
x
Cleaning of Turbidity
measuring chamber
x
Turbidity wiper blade
replacement
x
MI6200-
0001