GWFLORID Maintenance Manual
208
Air Conditioning System Terminal Definition
Pin
Interface signal
Pin
Interface signal
A
Emergency lamp relay
2
Parking lamp drive +
B
Power supply (+)
3
Safety indicator
lamp drive +
C
Ground
4
Blower LO gear drive +
D
Power supply
5
Blower common
terminal GND
E
Air conditioner
request signal
6
Blower HI gear drive +
F
Blower relay
9
Blower M1 gear drive +
10
Blower M2 gear drive +
Air conditioner switch
Hazard warning rear defroster switch
night li safety instruction
Cylinder
Blade
Exhaust valve
Rotor
Exhaust
valve
Compressor
Entire outline structure (shown on the left)
Rotary vane compressor’s operation
As the diagram shows, when the rotor is rotating under an
external force, due to the synergism of centrifugal force and the
oil pressure difference on the five vanes of the rotor, their edge
clings to the cylinder wall. Because the fixed cylinder is oval
shaped, while rotating on the rotor, the rotor vanes spread and
retract according to the cylinder's geometrical shape, which in
turn makes the crescent shape consisting of the cylinder, vanes,
etc. to change continuously, so as to achieve the functions of
suction, compression, and exhaustion.
Summary of Contents for Florid
Page 1: ......
Page 3: ......
Page 31: ...GWFLORID Maintenance Manual 24 Chassis LH side Front Front Upper Lower Unit mm...
Page 32: ...25 Overall Parameters Chassis Continued LH side Front Unit mm Axis Axis...
Page 281: ......