LAYOUT OF THE COLUMNS
=
=
Figure 15
Figure 16
Figure 17
• • Position the columns
at the centre of the lateral
of your pool, supported
against the boards (figure
15).
Tighten the columns
well around the entire
layer of boards
• Vertically drill the layer
using a drill with a Ø 10 mm
bit for concrete, and using the
column as a guide. The depth
of the hole should be at least
100 mm to guarantee good
fixing.
• Place the fixing bolts
(with washers and nuts)
into the holes and fix them
with the help of a hammer.
COMPLETELY hammer in
the fixing bolts (only the
head should be visible).
• Tighten crosswise the 4
nuts.
The support
columns are
installed with a
drill after laying the
second layer of boards.
Tighten the columns well around
the entire layer of boards.
COMPLETELY hammer
in the fixing bolts
(only the head should b
e visible).
3rd LAYER OF BOARDS
• Install the third layer of boards as shown in figure 18.
The position of the refilling fitting with key and the skimmer should be defined at the start of the assembly (read the specific
paragraphs).
A12
A11
A11
A11
A11
A11
A12
A11
Figure 18
Ref. KWOV436