
138
KARRERA K-FRAME — Installation & Service Manual
Section 5 — Basic Configuration
Figure 93. Tally Relay Assign Menu
Tally Relay Group
- Delegates the menu controls to configure the selected Tally
Group. The A, B, C, and D Tally Groups correspond to Tally/GPI connec-
tors 1 through 4 on the rear of the Karrera K-Frame Video Processor.
Calculation Enables
- Assigns the Tally Calculators to the delegated Tally
Group. When a calculator button is off, that calculator’s results will not
trigger relays for that Tally Group.
Note
A calculator must be activated with its
Calc On
button before it can be
assigned to a Tally Group (see
on
).
Assigning Sources to Tally Relays
Sources are assigned to specific relay connectors with the controls on the
upper right.
1.
Touch the button for the desired Relay in the center of the menu.
Summary of Contents for KARRERA K-FRAME
Page 12: ...12 KARRERA K FRAME Installation Service Manual Contents ...
Page 30: ...30 KARRERA K FRAME Installation Service Manual Regulatory Notices ...
Page 56: ...56 KARRERA K FRAME Installation Service Manual Section 2 Control Surface Installation ...
Page 266: ...266 KARRERA K FRAME Installation Service Manual Appendix B Field Replaceable Units ...
Page 278: ...278 KARRERA K FRAME Installation Service Manual Index ...