PLANETARY HUBS
ASSEMBLY PROCEDURE FOR MAJOR ASSEMBLY
S t a r t w i t h h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) w i t h l a r g e o p e n e n d u p .
A s s e m b l e i n t e r n a l g e a r ( 2 ) o n t o t h e s p i n d l e o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
P l a c e t h r u s t w a s h e r ( 1 5 ) o n t o t h e s p i n d l e p i l o t o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
P l a c e t h r u s t b e a r i n g ( 1 6 ) o n t o s p i n d l e p i l o t o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
P l a c e t h r u s t w a s h e r ( 1 5 ) o n t o s p i n d l e p i l o t o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
D r o p s p a c e r w a s h e r ( 7 ) i n t o s p i n d l e o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
P l a c e s p r i n g ( 8 ) i n t o s p i n d l e o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
P l a c e s p a c e r w a s h e r ( 7 ) i n t o s p i n d l e o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
S e c u r e r e t a i n i n g r i n g ( 9 ) i n t o g r o o v e i n s p i n d l e o f h u b - s p i n d l e s u b - a s s e m b l y ( 1 ) .
S e c u r e r e t a i n i n g r i n g ( 1 0 ) i n g r o o v e o n i n p u t s h a f t ( 1 1 ) .
P l a c e l o n g s p l i n e d e n d o f i n p u t s h a f t ( 1 1 ) i n t o s p i n d l e o f h u b - s p i n d l e h u b -
assembly (1).
S l i d e t h r u s t s p a c e r ( 1 2 ) o n t o i n p u t s h a f t ( 1 1 ) .
P u t “ O ” r i n g ( 5 ) i n h u b c o u n t e r b o r e o f h u b - s p i n d l e .
P l a c e c a r r i e r s u b - a s s e m b l y ( 3 ) o n a f l a t s u r f a c e w i t h l a r g e g e a r s u p . F i n d
m a r k e d ( p u n c h m a r k e d ) t e e t h o n t h e l a r g e g e a r s . R o t a t e u n t i l t h e m a r k s a r e i n
a s t r a i g h t - u p p o s i t i o n . ( S e e F i g u r e ) .
Place ring gear (4) over large gears of carrier sub-assembly (3).
Holding ring gear (4) in mesh with large gears, pick-up carrier sub-assembly (3)
u n t i l m a r k e d h o l d i s l o c a t e d o v e r o n e o f t h e c o u n t e r b o r e d h o l e s i n h u b o f h u b -
spindle sub-assembly (1). Carrier sub-assembly (3) must rotate freely.
P u t i n p u t g e a r ( 1 3 ) o v e r i n p u t s h a f t ( 1 1 ) a n d m e s h i n g w i t h l a r g e g e a r s o f c a r r i e r
s u b - a s s e m b l y. B e s u r e t h a t i n p u t g e a r ( 1 3 ) r e l i e f i s a s s h o w n . ( S e e F i g u r e ) .
P u t “ O ” r i n g ( 5 ) i n t o c o v e r c o u n t e r b o r e o f c o v e r s u b - a s s e m b l y ( 6 ) . H o l d “ O ”
ring in place with petroleum jelly or grease.
Place thrust washer (15) into carrier counterbore of carrier sub-assembly (3).
Place thrust bearing (16) into carrier counterbore of carrier sub-assembly (3).
Place thrust washer (15) into carrier counterbore of carrier sub-assembly (3).
P l a c e c o v e r s u b - a s s e m b l y ( 6 ) o n t o r i n g g e a r ( 4 ) w i t h o i l c h e c k p l u g i n c o v e r
sub-assembly (6) located 90 from oil fill plug in hub-assembly sub-assembly
(1).
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
24
Summary of Contents for LOED 534A
Page 5: ...MODEL 534 6 000 Capacity 4 FIGURE 1...
Page 20: ...19 FIGURE 19...
Page 28: ...CARRIER SUBASSEMBLY FRONT 24 TO 1 REAR 35 TO 1 27 FIGURE 24...
Page 41: ...SECTION II TROUBLE SHOOTING 41 FIGURE 40...
Page 44: ...TROUBLESHOOTING GUIDE FOR GEAR TYPE HYDRAULIC PUMPS 44 FIGURE 43...
Page 55: ...REAR DRIVE MOTOR 55 FIGURE 72...
Page 56: ...PARTS IDENTIFICATION 56 FIGURE 73...
Page 74: ...FRONT DRIVE MOTOR before s n 237 74 FIGURE 119...
Page 75: ...75 FIGURE 120...
Page 88: ...FIGURE 150 FIGURE 151 88...
Page 89: ...FIGURE 152 89...
Page 90: ...FIGURE 151 FIGURE 153 90...
Page 91: ...FIGURE 154 91...