Appendix B - Alarms
3A2776K
87
Possible Alarms by Mode
The following table outlines the alarms that you may receive while operating the system. The alarms are categorized
according to each mode.
Mode
Control Logic
Alarms
Spray
Dosing valves close for startup test; green light blinks.
--
If fluid pressure is under 1000 psi (7 MPa, 70 bar), STOP.
P1AX
If pumps move (indicating internal leakage), STOP.
F7AX, F7BX
If fluid pressure is more than 103% of allowed maximum, air motor shuts off until fluid
pressure drops.
None
If is pressure more than 110% of allowed maximum, STOP.
P4BX
Dosing valve A opens, and dosing valve B cycles to maintain ratio.
--
A and B blue lights illuminate when dosing valves are operating.
--
If there is not enough B component to hold ratio, dosing valve A closes momentarily.
R5BE
If A or B component is more than 5% off ratio setpoint, STOP.
R1BE, R4BE
If A dose size is too large, STOP.
QDAE
A and B dosing valves close momentarily at each pump changeover.
--
Spray mode turned on with system in weight mode and uncalibrated
R5DX
Park
Both dosing valves open; A and B blue lights turn on.
--
User opens circulation valves or sprays gun. When pump reaches bottom stroke the
blue light turns off.
--
If park does not complete in 10 minutes, turn off air to both motors.
DEAX, DEBX
Circulation
A and/or B dosing valves close and motor air turns on.
--
If fluid pressure exceeds 3000 psi (21.0 MPa, 210 bar) on the A pump, receive yellow
light advisory.
P4AX
If fluid pressure exceeds 5600 psi (39.2 MPa, 392 bar) on the A pump, STOP.
P4AX
If no movement in 10 minutes, turn off air to both motors.
DEAX, DEBX
Pump did not move for 5 seconds while in circulation mode.
F8RX
Pump Test
Both dosing valves close; green light blinks.
--
If fluid pressure is under 1500 psi (10.3 MPa, 103 bar), STOP.
P1AX, P1BX
If pumps move (indicating leakage) STOP.
F7AX, F7BX
Turn on A blue light, open A dosing valve, user opens sampling valve.
--
Close A dosing valve on upstroke; check for no movement.
DFAX
Close A dose valve on down stroke; check for no movement.
DGAX
Open A dose valve and dispense total of 750 ml material, close valve, turn off blue
light.
--
Repeat for B side.
DFBX, DGBX
If both pumps pass pump test, display shows two beakers of 750ml each.
--