Installation
Fig. 1
A
B
C
Detail of Air Controls
22
1
37
150
16
101
102
105
24
E
206
14
12
F
G
21
19
11h
208
11a
11b
11j
109
114
40
11
202
201
23
4
See
Detail of Air Controls
in upper left corner.
1
Ensure that there is 9 ft (2.8 m) overhead clearance
for the elevator when fully raised.
2
Mount the pump module so the top of the bracket is
4 to 5 ft (1.2 to 1.5 m) above the floor.
3
The suction hose is 6 ft (1.8 m) long. Do not stretch
the hose tight; let it hang as shown, to assist fluid
flow into the pump.
4
3
2
5
The center of the two outer left holes of the heater
bracket must be no more than 9 in. (228 mm) from the
right edge of the pump bracket (22). See page 27.