GPO Display
Video Walls - Commercial Monitors - Digital Signage - Visual Solutions www.gpodisplay.com
Components for Installation
Open all packages and take stock of the contents. Make sure all materials are present
and there is no visible damage.
M8 NUT
SCREW (FH M 4*8L)
(for Side Covers)
Side Cover (Trim)
Wall Mount
USER MANUAL
SCREW (BH T 4*20L)
BOLT (M8*20L)
Suggested Tools for Installation
Laptop with USB to RS-232 adapter
Drill w/ metal, wood, and mortar bits
Phillips head screwdriver
Tape Measure
Level
Socket Set
Wrench set
Shims (metal or wooden for alignment adjustment
when a wall is uneven)
Cable ties for final cable dressing
Screen cleaner and lint-free cloth for final cleanup
* This is a bare minimum list
–
review statement of
work to determine all tools needed.
Supporting Documents and Software
Display Manual
Serial Command Protocol and video wall control
program (varies by video wall series)
ACR Manual (if applicable)
Wall Mount Drawing
8
Chapter 2 Preparations
Y-Knob
Z-Bolt