GPO Display
Video Walls - Commercial Monitors - Digital Signage - Visual Solutions www.gpodisplay.com
22
Display Mounting (3x3 example)
STEP 3
Begin mounting displays as described on p. 21 with the
bottom/right display, as shown above. Please note that the
numbers used in this mounting diagram DO NOT correspond
with SET IDs. After mounting display, connect cables and power
on. Make sure the that the input & output cables are connected
correctly- these are sometimes confused for one another. Check
the display for signal and then power off with remote controller.
Install a display directly above the previously mounted display. After
inserting the pegs in the opening, slowly & carefully ease the display down
until it comes to in the installation channel. Make sure that the display is
eased down into the installation channel evenly- if one side is dropped too
quickly, damage to the previously-installed display may occur.. Refer to p.
5 for more information on recommended gap between displays. Connect
cables and power cords.
Follow the same steps for the top/right display as were set forth for the
second display. Move all three displays to the right.
Set ID
#9
1
3
Set ID
#6
2
Set ID
#9
1
Set ID
#3
3
Set ID
#6
2
Set ID
#9
1
Set ID
#3
Mount & display order: Bottom to top
Alignment adjustment order: Top to bottom
Chapter 4 Display Mounting