5.  NORMAL OPERATION

Cleaning Cycle

1.

   Once the system is filled with 

ScaleBreak®

 and water, turn the 

Main Pump 

Switch 

ON (up position).

2.

   For a closed vessel, the lid of the Venting Drum should always be securely 

fastened to avoid splash.

3.

  Make sure 

Chemical Pickup Hose

 in fully inserted into chemical container.

4.

 Slide 

pH Controller Switch 

to 

“AUTO”.

5.

   As scale and deposits are dissolved, the pH of the 

ScaleBreak®

 Decaling 

Solution will tend to rise. The 

pH Sensor

 and 

pH Controller

 will sense this 

and inject concentrated 

ScaleBreak®

 into the system, lowering the pH to the 

optimal level.

6.

   After one hour of no chemical injection, the 

"CLEANING IN PROGRESS"

 light 

will go out. This generally means that all the scale has been dissolved. (no rise 

in pH as scale is fully dissolved).

Venting Drum / Overfill alarm

 WARNING:

 In a closed vessel system, the Venting Drum serves two functions – to 

vent any fumes from the descaling operation, and to provide extra volume for the 

chemical injected into the system. To prevent the overfilling of the Venting Drum 

if too much chemical is added, the GDS-15-PH are equipped with an 

“OVERFILL 

ALARM” 

Lamp. Also, the GDS-15-PH has an automatic chemical pump shut-off 

circuit. If the Venting Drum is full, the Chemical Pump will be disabled and will not 

inject anymore chemical into the system until the liquid level in the drum  

is reduced.

If the red "OVERFILL ALARM" Lamp is lit, the Venting Drum is full:

1.

  Shut down the unit by turning the 

Main Pump Switch 

Off (down position).

2.

 Slide 

pH Controller Switch 

to 

“OFF”

.

3.

  If a hose is connected to 

Valve #2

 (Pump Input Valve):

3a. Close 

Valve #2

3b.   Close the valve on the hose connected to 

Valve #2

, then disconnect  

the hose.

4.

   Open 

Valve #2

 (Pump Input Valve) and drain at least 5 gallons (19 L) of solution 

into a suitable container.

5.

   If cleaning an open vessel, reconnect the hose, then open 

Valve #2

 and the 

hose valve.

6.

   Flip 

Main Pump Switch 

On and slide 

pH Controller Switch 

to “Auto” to continue 

cleaning.

Summary of Contents for GDS-15-PH

Page 1: ...GDS 15 PH Goodway Descaling System With Automatic Ph Control Operating and Maintenance Instructions Read before operating...

Page 2: ...Descaling Solution 18 Shutting Down 18 pH Sensor Storage 19 General Maintenance and Storage 19 Quick Start Guide 20 Accessories Spare Parts 21 Troubleshooting 22 Specifications 22 23 Wiring Diagram GD...

Page 3: ...t 5 Keep bystanders children and visitors away while operating this unit 6 Turn unit off and relieve pressure in the hoses when done 7 Do not use while tired or under the influence of drugs alcohol or...

Page 4: ...ilure close all ball valves on the unit to prevent backflow and chemical overflow of the unit CAUTION If you are unsure about chemical compatability call Goodway at once Using a non compatable chemica...

Page 5: ...ands after using WARNING do not dump low ph solution less than 5 0 into sink or drain disposal must be according to local state and federal laws Warranty Information Please check the included warranty...

Page 6: ...with one 1 GDS 15 PH unit two 2 15 4 5 m hoses with shut off valves one 1 pH Sensor Storage Solution bottle and one 1 box of pH Calibration packets Venting Drum 15 foot 4 5 m Hose with Shut Off Valve...

Page 7: ...R SWITCH controls the main recirculation pump This switch must be in the ON position up for normal recirculation operation Circuit Breaker The CIRCUIT BREAKER is a fast acting resettable 15 amp circui...

Page 8: ...s pH CONTROLLER DS 03 The pH Controller is the brains of the GDS 15 PH It monitors the pH of the descaling solution and injects chemical whenever the pH rises above the setpoint The pH Controller can...

Page 9: ...GDS 15 PH 0519 9 Valve 1 Drum Valve Valve 2 Pump Input Valve Valve 3 Pump Output Valve PLUMBING CONNECTIONS Venting Drum Connection Power Cord Chemical Pickup Hose Control Valves...

Page 10: ...requirements for ScaleBreak injection into units logistics on hose connections on inlet and return points 6 ScaleBreak general injection process understanding and logistics 7 CO2 gas escape venting re...

Page 11: ...king temperatures if heat is to be applied It may be necessary to remove selected system components if the cleaning process might damage them The entire cleaning procedure process must be developed in...

Page 12: ...wdriver into the CAL opening on the pH Controller and turn until the reading is correct If you cannot calibrate the sensor it may be damaged Call Goodway for more information To Check the Calibration...

Page 13: ...sure the unit is plugged in and the GFCI is reset 4 Press the SET button on the pH Controller 5 Insert a small screwdriver in the SET opening 6 Turn the screwdriver clockwise for a higher pH Setpoint...

Page 14: ...he appropriate catch basin 4 PRIME THE CHEMICAL PUMP AND MAIN PUMP The Chemical Pump and Main Pump MUST be primed for proper operation If not properly primed the descaling solution will not circulate...

Page 15: ...y connecting the chemical pickup hose to a water supply and having it force fluids into the pump IMPORTANT Valve 1 Venting Drum Valve must be OPEN for proper operation with a closed vessel type system...

Page 16: ...rum and clean the unit using the Auto mode on the pH Controller a Make sure the Venting Drum is only full up to the elbow of the Overfill Sensor This will allow the maximum amount of ScaleBreak to be...

Page 17: ...ions to vent any fumes from the descaling operation and to provide extra volume for the chemical injected into the system To prevent the overfilling of the Venting Drum if too much chemical is added t...

Page 18: ...eactions will cause severe foaming and overflow the venting drum SHUTTING DOWN Once the descaling solution is neutralized 1 Close the valves on the hoses 2 Disconnect the hoses from the vessel Leave t...

Page 19: ...ry to maximize performance and longevity Protect unit from freezing temperatures Do not store unit outdoors To protect the unit from damage the plumbing pumps and hoses should be drained before the un...

Page 20: ...itch to AUTO 12 If red OVERFILL ALARM lamp is lit Venting Drum is full on GDS 15 PH chemical pump will be disabled Drain some solution into a suitable container to continue page 13 13 After one hour o...

Page 21: ...nsor Storage Solution DS 04 3 pH Calibration Packets DS 04 CAP pH Sensor Tip Cap DS SENSOR CAP pH Sensor Cam and Groove Cap Scalebreak 5 ScaleBreak Descaling Solution 5 Gallon Bucket Scalebreak 30 Sca...

Page 22: ...LL ALARM Thermal breaker tripped motor overheated Chemical pump fuse is blown pH Rises Above Setpoint During Cleaning Chemical supply is empty Chemical Pump is not working see above pH Sensor is damag...

Page 23: ...f priming Temperature N A Noise Level N A Voltage Hz 110 120 Volts AC 60 Hz Amps 10 75 Amps 120 Volts Watts 1240 Watts Voltage Hz 220 240 Volts AC 50 60 Hz Amps 5 38 Amps 240 Volts Watts 1240 Watts Ho...

Page 24: ...GDS 15 PH 0519 24 WIRING DIAGRAM GDS 15 PH 120 VOLT...

Page 25: ...GDS 15 PH 0519 25 WIRING DIAGRAM GDS 15 PH 240 VOLT...

Page 26: ...GDS 15 PH 0519 26 PLUMBING DIAGRAM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17...

Page 27: ...e 3 4 6220 3 1 Hose Barb 1 5 DS 26 6 lg Nipple 1 6 DS 34 Check Valve 1 7 DS 25 3 lg Nipple 1 8 DS 22 Tee 2 9 DS 27 12 lg Nipple 3 10 DS 29 FxF Elbow 4 11 DS 26 6 lg Nipple 3 12 DS 30 MxF Elbow 1 13 DS...

Page 28: ...rp Stamford CT USA Effective date May 24 2019 Goodway is a Trademark of Crossford International Goodway reserves the right to improve products contact the factory for the latest configuration and uses...

Reviews: