
Index of figures
A
GOTIS AST-2 R documentation
A - 1
1.0
GOTIS Monitoring / Operator Controls
1 - 1
Fig. 1
Monitoring / operator controls for GOTIS
indicator lamps in the CDM 1-1
1 - 1
Fig. 2
Monitoring / operator controls for GOTIS
key-operated switch in the cab
1 - 1
Fig. 3
Indicator lamps in the CDM
1 - 2
Fig. 4
GOTIS Monitoring / Operator Controls
1 - 3
Fig. 5
GOTIS key-operated switch
1 - 4
Fig. 6
Approvals
1 - 5
2.0
Description of GOTIS
2 - 1
Fig. 1
Description of GOTIS
2 - 1
Fig. 2
Description of GOTIS
2 - 2
3.0
GOTIS maintenance intervals
3 - 1
Fig. 1
Explanation of symbols on maintenance schedule
3 - 2
Fig. 2
Symbols for maintenance intervals
3 - 2
4.0
Maintenance schedule
4 - 1
5.0
Maintenance tasks
5 - 1
Fig. 1
Checking the voltage supply to the measuring amplifier
5 - 3
Fig. 2
Checking voltage supply to measuring cell
5 - 4
Fig. 3
Checking the measuring signal
5 - 5
Fig. 4
Checking the output signal at measuring amplifier
5 - 6
Fig. 5
Overview of hydraulic supply operating unit
5 - 9
Fig. 6
Operating unit – hydraulic connection to tank
5 - 9
Fig. 7
Installing the GOTIS Test tool AST-2 R
5 - 10
Fig. 8
Connect hydraulic cylinder
5 - 11
Fig. 9
Extend/retract hydraulic cylinder
5 - 12
6.0
GOTIS electrical adjustment values
6 - 1
7.0
Troubleshooting List
7 - 1
8.0
Measuring amplifier order form
8 - 1
rsi / 03.2009
Goldhofer Aktiengesellschaft ··· Donaustrasse 95 ··· D - 87700 Memmingen
BA part 1/0
GOTIS AST-2 R
Phone +49 (0)8331/15-0 ··· FAX +49 (0)8331/15-239
GOTIS_AST-2-R_eng_00.vp
Index of figures
Page 1
Index
Designation
Chapter / Page
Property of American Airlines