Operating manual for the TG uni 1, TG euro 1 and TG euro 1 med appliance tester
Conducting tests in accordance with DIN VDE 0701-0702, Example 1 – Devices with a protective conductor (PC I)
25
Fig. 25
Manual test procedure means that you have to confirm every test
stage by pressing the [OK] button to get to the next test stage.
Automatic test procedure means that a test stage automatically
changes to the next after (e.g.) 5 seconds – except for confirmation
of connection to the mains voltage (see Point 6.6, basic settings of
the appliance tester).
The [cancel] button takes you back to the Main menu. To move to the next
stage press the [->next] button (also see Diagram 1 in Point 9.8).
10.1 Visual inspection
The [next] button takes you to the first stage of the test, the visual
inspection (Fig. 24).
The housing, connecting cable, inscriptions and other parts should be
inspected in this test. You confirm positive results of the visual inspection
by pressing the appropriate buttons – the display changes from „not OK“ to
„OK“ (Fig. 25).
Please note: The visual inspection screen is not displayed in
„Expert mode“
(TG euro 1 and TG euro 1 med only)
.
Fig. 24
Fig. 26
If the test object has touchable conductive parts that are not connected to the
protective conductor, then a touch current test must be performed (Fig. 26).
For all subsequent tests, the test object must be switched on.
Pressing the [next] button brings the device to PE resistance test screen
(Fig. 27).
f
f
f
f