
0020167175_01 - 02/13 - Glow-worm
18.2 Boiler
Access
For replacement of parts, the front casing panel of the boiler will
need to be removed.
•
To remove undo the two screws on the underside of the front
casing and lift o
ff
.
18.3 Viewing
window
3
4
5
2
1
Key
1 Fibre
washer
2 Steel
washer
3 Glass
4 Steel
washer
5 Circlip
•
Remove the circlip (5).
•
Remove the steel washer (4).
•
Remove
fi
bre washer (1).
•
Remove the glass (3).
18.3.1 Expansion
vessel
B
C
D
E
A
3
2
1
4
2
1
Key
1 Connector
2 Expansion
vessel
3 Upper support bracket
4 Retaining
screw
5 Gasket
Drain the boiler heating circuit as described in the appropriate
chapter "Draining".
•
Remove the two screws (4).
•
Undo the connector (1) at the base of the vessel.
•
Remove upper support bracket (3).
•
Remove the expansion vessel (2).
•
Fit a new gasket between the expansion vessel and connector.
•
Re
fi
ll, vent and pressurise the boiler.
MAINTENANCE
- 40 -
Summary of Contents for ULTIMATE 30c
Page 1: ...condens Installation and Servicing ULTIMATE 30c G C No 47 044 48 ULTIMATE 35c G C No 47 044 49...
Page 2: ......
Page 51: ...Declaration of Conformity Installation Commissioning and Service Record...
Page 52: ...a...
Page 54: ......
Page 55: ......