0020167175_01 - 02/13 - Glow-worm
General
This boiler is designed for use as part of a sealed water central
heating system with fully pumped circulation. The pump,
expansion vessel and associated safety devices are all
fi
tted
within the boiler.
Safety valve
The safety valve is an integral part of the boiler and it cannot
be adjusted. The pipe from the safety discharge valve must
discharge safely in accordance with standards.
Expansion vessel
The boiler has an integral expansion vessel with a capacity of 8
litres (1.76 gallons), with a charge pressure of 0.75bar.
i
IMPORTANT:
The heating system volume should be calculated to
ensure that the expansion vessel is suitable, it may be
necessary to add an additional vessel.
- In GB, Guidance on vessel sizing is also given in the current
issue of BS5449 and BS7074 Part 1.
- In IE, current edition of I.S.813 “Domestic Gas Installations”.
Bypass
The boiler is
fi
tted with an automatic bypass.
•
Ensure that under no circumstances does the
fl
ow rate drop
below the
fi
gure speci
fi
ed, refer to chapter "Technical data".
Filling the sealed system
i
IMPORTANT:
The boiler does not contain any
fi
lling loop, an external
one must be
fi
tted.
Suitable external
fi
lling systems are shown diagrammatically, see
diagram below.
3
2
1
4
7
6
5
Key
1 Heating
fl
ow circuit
2 Heating return circuit
3 Boiler
4 Double check valve assembly
5 Domestic cold water supply in
6 Temporary
fi
lling loop (remove immediately after
fi
lling)
7 Drain
point
The system should be pressurised to 0.8bar, indicated on the
digital display with no heating demand.
Drain points
Drain taps must be provided at all low points of the system, which
will allow the entire system to be drained.
Drain taps shall be to the current issue of BS2879.
Water treatment
Existing system
- It is essential that prior to installing the new
boiler the system is thoroughly
fl
ushed.
New system
- For optimum performance after installation, the
boiler and its associated central heating system should also be
fl
ushed.
Flushing shall be carried out in accordance with BS 7593, a
chemical cleanser can be used either Sentinel X300, X400 or
Fernox F3 are suitable.
It is recommended to
fl
ush existing systems
fi
rst before
fi
tting the
new boiler.
•
Ensure all cleanser is removed from the whole system before
adding an inhibitor.
For long-term corrosion protection after
fl
ushing, an inhibitor
suitable for stainless steel heat exchangers can be used. Either
Sentinel X100 or Fernox F1 inhibitor can be used.
The boiler is suitable for use on systems using softened water.
7.3 Dimensions
418
338
130
740
INSTALLATION
- 10 -
Summary of Contents for ULTIMATE 30c
Page 1: ...condens Installation and Servicing ULTIMATE 30c G C No 47 044 48 ULTIMATE 35c G C No 47 044 49...
Page 2: ......
Page 51: ...Declaration of Conformity Installation Commissioning and Service Record...
Page 52: ...a...
Page 54: ......
Page 55: ......