
Supplied By www.heating spares.co Tel. 0161 620 6677
28
221473B
Diagram 3.1
2883
1
2
3
L
N
E
CABLE TO
REMOTE
HEATING
CONTROLS
CABLE
CLAMP/COVER
SCREW (2)
MAINS
CABLE
CABLE
CLAMP
3.1 Initial Checks
If the boiler fails to operate, first check the following:
1) That the electrical supply is available at the boiler and the
fuses are in order.
NOTE: THE BOILER CONTROL BOARDS CAN BE DAMAGED
BY INCORRECT TESTING WITH THE POWER ON.
2) Make sure that the system pressure gauge registers 0.7bar,
minimum, and that the automatic air vent works. Refer to
Installation Instructions, Section 11.2.
3) That the gas supply is available at the boiler and purged of
air.
4) That the boiler is set for the required service.
5) With the boiler central heating selector switched “Off”, see
diagram 1.2 check that the domestic water supply is available
and water flows freely from the hot taps. Close the taps.
6) With the boiler central heating selector switched “ON”, see
diagram 1.2, check that all heating system controls, if fitted, are
working correctly and calling for heat. If not isolate the boiler
from the electrical supply. Disconnect the rear multipole
connector at the base of the boiler and release the cable from
the clamp.
Remove the connector cover and dependent on the type of
control fitted test for continuity, mains or at terminals 1 and 2,
see diagram 3.1.
7) Check reset button - if red neon is lit press button. In certain
circumstances the red neon light may not come on, due to no
system demand. Turn on a domestic hot water draw off tap to
create a demand, the light should come on, if reset is required.
Allow the boiler and system to cool down waiting at least a
minimum of four minutes before pressing the reset button.
If this is satisfactory proceed with the detailed fault finding as
Section 3.3.
3.2 Clock/Timer
If the clock has failed it can be bypassed by disconnecting the
plug at the wall frame.
Gain access to the control box refer to Section 4.12, disconnect
the clock wiring harness from the 4 way terminal block. Fit a
yellow link between the terminals Y1 and Y2.
This is a temporary measure and the clock should be repaired
or replaced as soon as possible.
3 Fault Finding
CONTROL BOARD
TERMINALS,
BLOCK 3
CONTROL BOARD
TERMINALS,
BLOCK 2
3
2
2B
2B
2A
2A
2A
TRANSFORMER
CONTROL BOARD
PERMANENT
LIVE 230V~50Hz
T2A
FUSE
LOW
VOLT
24V~
CVI IGNITION UNIT
230V~
br
b
br
br
4b
5b
6b
3a
br
b
or
p
y
bl
w
br
b
br
L
N
br
N/C
N/O
br
(L)
OPTIONAL
SWITCHED LIVE
FROM ROOM
STAT. 230V~50Hz
COMMON
CLOCK/TIMER
b
(N)
b
p
y
(L)
(N)
ON
PUMP
APS
FAN
RESET /
NVLO
INDICATOR
C
3
3
6
M
(N)
BOILER
OVERHEAT CUT OFF
br
Diagram 3.2
5034
KEY
br
BROWN
b
BLUE
r
RED
p
PURPLE
v
VIOLET
y