
Supplied By www.heating spares.co Tel. 0161 620 6677
10
221473B
Diagram 3.4
SIDE FLUE - 1 and 2 metre
Left or Right
1m DISTANCE 'Y' = 80 TO 843mm
2m DISTANCE 'Y' = 80 TO 1843mm
3 Flue and Ventilation
"Y"
4739
3.1 Flue
Ventilation must be provided in accordance with the rules in
force in the countries of destination.
The following information refers specifically to his boiler:
3.2 Flue Position and Length
The air and flue ducting connect to the top of the boiler using the
air box and can be positioned in one of three directions:
Rearward, left or right.
The standard flue is able to provide the duct length range shown
in diagram 3.1 for a rear flue or diagram 3.2 for a side flue.
If a longer flue duct is required, do not extend the ductings.
A 1 or 2metre flue system and elbow / terminal kit must be used
and can be supplied.
This is able to provide the duct length range shown in diagram
3.3 for a rear flue, diagram 3.4 for a side flue.
A Vertical Flue Kit can be supplied with instructions.
To make a neat finish to the flue outlet a flue collar kit, part No.
443286, with instructions, is available.
The use of this collar will mean that the flue lengths will need to
be altered, full instructions are given in the kit.
Diagram 3.3
REAR FLUE - 1 and 2 metre
4738
"X"
Diagram 3.2
SIDE FLUE - STANDARD
Left or Right
DISTANCE 'Y': 80 TO 353mm
Diagram 3.1
WALL THICKNESS 'X': 75 TO 408mm
2813
2812
REAR FLUE - STANDARD
"X"
"Y"
1m DISTANCE 'X' = 75 TO 898mm
2m DISTANCE 'X' = 75 TO 1898mm
3.3 Terminal Position
The minimum acceptable siting dimensions for the terminal
from obstructions, other terminals and ventilation openings are
shown in diagram 3.5.
The terminal must be exposed to the external air, the position
allowing free passage of air across it at all times.
Car ports or similar extensions of a roof only, or a roof and one
wall, require special consideration with respect to any openings,
doors, vents or windows under the roof. Care is required to
protect the roof if made of plastic sheeting. If the car port
comprises of a roof and two or more walls, seek advice from the
local gas undertaking before installing the boiler.
If the terminal is fitted within 600mm below plastic guttering, an
aluminium shield 1500mm long should be fitted immediately
beneath the guttering or eaves. If the terminal is fitted within
450mm below painted eaves or a painted gutter, an aluminium
shield 750mm long should be fitted immediately beneath the
guttering or eaves.