Heat pump water heater
- 34 -
EN
3
INSTALLATION AND FIRST START-UP
(qualified personnel only)
CAUTION!
•
If using the water heater without the comfort feature, the installation room must have a volume of
at least 20 m
3
and/or a surface of over 8 m
2
, with an appropriate ventilation. Avoid installing the
equipment in environments where the conditions may favour ice formation.
•
The equipment must be installed in compliance with the national installation regulations.
•
Operations involving the hot water heat pump must only be performed by qualified personnel!
•
Observe the safety regulations.
•
The installation environment and the electrical and hydraulic systems the equipment shall be
connected to must comply with the regulations in force.
•
You need to install the equipment at the prescribed distance from the room walls and ceiling, to
ensure proper operation and for easy maintenance.
•
The wall on which the equipment is to be installed must be able to bear its weight.
•
The equipment ventilation openings must not be obstructed. (Minimum distance of 1 m from air
outlet opening to combustible surfaces)
•
The chosen environment must the suitable for the equipment IP degree, in accordance with the
regulations in force;
•
The ambient temperature (or the temperature of the input air) must range b8°C and
+32°C.
•
If possible, install the equipment in a room allowing to exploit the excess heat generated by
tumble-driers, refrigerators, freezers, etc.
•
Air must be neither excessively purified nor too contaminated with dust.
•
There must be a black water drain, with a syphon to eliminate condensation.
•
The cooler output air allows to reduce the ambient temperature by about 2 ...4°K.
CAUTION! The equipment is not intended to be used by any persons ( including children) having
reduced sensory or mental faculties, or lacking experience or knowledge, unless they are under the
supervision of a person in charge of their safety, or they have received proper instructions regarding
equipment usage.
Children must be watched to ensure that they don't play with the equipment.
3.1
Wall installation
After making sure that the wall is strong enough, fasten the 2 hooks, properly anchoring them to the wall. Then hang
the equipment to the wall, connecting the suspension bracket to the hooks previously fastened to the wall. (Fig. 2)
CAUTION! For proper operation make sure that the upper bracket is arranged horizontally and that
the equipment is arranged vertically. Help yourself with a level.
Keep the minimum distances indicated in Fig. 2
3.2
Hydraulic connection
The water input and output are marked as follows:
•
blue ring for the cold water input;
•
red ring for the hot water output;
Summary of Contents for Futura 100 TS
Page 2: ... 2 ...
Page 23: ...Scaldacqua a pompa di calore 23 IT Fig 3 Fig 4 ...
Page 24: ...Scaldacqua a pompa di calore 24 IT ...
Page 44: ...Heat pump water heater 44 EN 8 Illustrations Fig 1 Fig 2 Distances from any surface ...
Page 45: ...Heat pump water heater 45 EN Fig 3 Fig 4 ...
Page 46: ... 46 APPUNTI NOTES ...
Page 47: ... 47 ...