2.05.1
Electrical Connections Diagram
Flexible Conduit
Service Box
Connect flex conduit
from incoming supply
power here.
Ground Lug
Distribution Block:
connect supply
power to this side.
2.05 Electrical Connections
NOTE: Electrical installation materials (disconnects, breakers, conduit, connectors, wire, etc) shall
be supplied by the purchaser.
1.
Install appropriate circuit breaker(s) in Main Breaker Box! See
Section 2.04
.
2. (Recommended) Install a Quick-Disconnect between Main Box and Fryer; connect using flexible
conduit.
3. Connect flexible conduit from Quick-Disconnect through Fryer back panel to the Fryer Service Box at
the front of unit. Allow enough conduit slack so that the Fryer can be moved to provide clearance for
cleaning or service. See
Figure 2.05.1
.
4. Open Fryer door and remove Service Box Cover. See
Figure 2.05.1
.
5. Connect a ground wire between the Ground Lug and a proper earth ground.
6. Route appropriately sized supply power wires to the Fryer.
7.
Connect the supply power wires at the Distribution Block located in the Service Box. See
Figure
2.05.1
.
8. Reinstall Service Box Cover.
9. For “banked” installations, each Fryer in the battery will be connected in like manner.
GBF-Series Fryers
Installation
8
Main Breaker
Box
Quick-Disconnect
Box
(Recommended)
Summary of Contents for GBF-35 Banked
Page 4: ......
Page 12: ...x ...
Page 22: ...10 Installation GBF Series Fryers Notes ...
Page 32: ...20 Overview GBF Series Fryers 3 04 Lower Cabinet Area Add on Fryers for Banked Systems 1 2 ...
Page 42: ...30 Overview GBF Series Fryers Notes ...
Page 86: ...74 NOTES ...
Page 106: ...94 Parts List GBF Series Fryers 8 11 Filter Pan 3 1 5 4 2 8 9 7 10 6 A ...
Page 108: ...96 Parts List GBF Series Fryers Notes ...
Page 109: ...FOODSERVICE EQUIPMENT ...