6159932410-02
English
41 / 76
CONNECTIONS AND INSTALLATION
SECTION 7 - CONNECTIONS AND INSTALLATION
1 - INTERNAL VIEW
The diagram, characteristics and references used to order boards are detailed in the appendices at the end of this document.
2 - CONNECTIONS AND PERIPHERALS
2.1 - Connection side view
Servodrive board
Microprocessor Board
+ mains supply
+ Inputs/Outputs
Fuse box
On/Off switch
PC (serial port)
SubD 9 points
Input/Output
SubD 37points
Parallel printer
SubD 25 points
Torque connector for fixed
tools (EM range)
Motor connector for fixed
tools (EM range)
Connector for portable tools
(ER range)
Instant stop
Summary of Contents for CVIS II
Page 8: ...6159932410 02 English 8 76 SAFETY INSTRUCTIONS...
Page 12: ...6159932410 02 English 12 76 DESCRIPTION AND OPERATION...
Page 18: ...6159932410 02 English 18 76 INITIAL START UP...
Page 28: ...6159932410 02 English 28 76 RESULTS...
Page 48: ...6159932410 02 English 48 76 CONNECTIONS AND INSTALLATION...
Page 66: ...6159932410 02 English 66 76 CYCLE FLOWCHART AND TIMING CHART...