Rack and pinion hoist
Assembly and Operating Manual
52 / 92
BL054 GB Edition 08.2015
6.3.1
Trailing cable guide
Trailing cable guides must be installed to ensure that the trailing cable
runs freely into the cable bin.
Recommended distance to each other: max. 6 m
The more sensitive the hoist location is to wind forces, the shorter the
distances should be between trailing cable guides.
Assembly
−
Screw in trailing cable guides (1) with
rubber lugs onto the circular mast tube and
align centrally to the cable guide tube on
the trolley.
1
Summary of Contents for 14830
Page 2: ......
Page 3: ...Rack and pinion hoist Assembly and Operating Manual 3 92 BL054 GB Edition 08 2015...
Page 4: ...Rack and pinion hoist Assembly and Operating Manual 4 92 BL054 GB Edition 08 2015...
Page 36: ...Rack and pinion hoist Assembly and Operating Manual 36 92 BL054 GB Edition 08 2015...
Page 90: ...Rack and pinion hoist Assembly and Operating Manual 90 92 BL054 GB Edition 08 2015...
Page 91: ......