![GEDA 14830 Assembly And Operating Manual Download Page 27](http://html1.mh-extra.com/html/geda/14830/14830_assembly-and-operating-manual_573458027.webp)
Rack and pinion hoist
Assembly and Operating Manual
27 / 92
BL054 GB Edition 08.2015
4.2.1
Operating and control elements
Main switch
On the ground-station switch box
Serves the purpose of switching On/Off at the start/end of work.
In the event of malfunctions or
maintenance/repair work and at the end of
work the master switch must be secured with a
padlock to prevent it being switched on.
1 = Main switch
2 = Mains power control light
Manual control/ground control
The cable for the plug-in control is 5 m long.
1 =
EMERGENCY STOP
button
2 =
Selector switch
MANUAL (I) - AUTOMATIC (II)
3 =
UP
button
4 =
DOWN
button
5 = Hanging bracket
1
2
3
4
5
2
1
Summary of Contents for 14830
Page 2: ......
Page 3: ...Rack and pinion hoist Assembly and Operating Manual 3 92 BL054 GB Edition 08 2015...
Page 4: ...Rack and pinion hoist Assembly and Operating Manual 4 92 BL054 GB Edition 08 2015...
Page 36: ...Rack and pinion hoist Assembly and Operating Manual 36 92 BL054 GB Edition 08 2015...
Page 90: ...Rack and pinion hoist Assembly and Operating Manual 90 92 BL054 GB Edition 08 2015...
Page 91: ......