1.
Insert the cable (Ø 3-7mm) through the cable gland (50) and connect it to the
terminals (K1) and (K2) in the control top according to the connection
diagram.
2.
Secure the cable in the cable gland at a torque of 2.5 Nm.
®
Done.
6.5
Visual Display
6.5.1
Illuminated dome
Fig.23
1
Cap
2
+ button
3
Illuminated dome
4
- button
The following statuses are visualized by the illuminated dome:
•
Valve in rest position: green, see also Section 6.5.2, Page 53
•
Valve in end position: yellow, see also Section 6.5.2, Page 53
•
Lift valve disc (without LEFF): yellow flashing, see also Section 6.5.2,
Page 53
•
Lift double disk (without LEFF): quick flashing yellow, see also Section 6.5.2,
Page 53
•
Valve disk VT or double disk DT LEFF: flashing yellow/green (with proximity
switch only)
•
Valve disk moving to the non-actuated position: flashing green
•
Valve disk moving to the actuated position: flashing yellow
•
Programming mode active: red
•
Error/malfunction: rapidly flashing red
•
Default, standard version:
Control top unprogrammed: flashing 3 times - pause - flashing 3 times - pause
Assembly and installation
Visual Display
430BAL010699EN_6
52
17.03.2022
Summary of Contents for T.VIS A-15
Page 6: ...430BAL010699EN_6 6 17 03 2022...
Page 116: ......