18
2016-01 ·
Zawór stabilizacji ciśnienia DHV
/ Constant pressure Valve DHV
Cleaning Effect
The cleaning effect depends on the following factors:
• Temperature
• Time
• Mechanics
• Chemicals
• Degree of soiling
These factors can be combined in such a way as to make
an optimal cleaning result probable. Depending on the
cleaning method (medium, concentration, temperature
and contact times), the seals are affected to different
degrees. This can impair the function and the service
life.
Passivation
Before commissioning a plant, passivation is commonly
carried out for long pipes and tanks.
Valve blocks are usually excepted from this. Passivation
is typically performed using nitric acid (HNO
3
) at
approx. 80 °C (176 °F) at a concentration of 3 % and a
contact time of 6 to 8 hours.
Skuteczno
ść
czyszczenia
Skuteczność czyszczenia zależy od następujących czyn-
ników:
• temperatura
• czas
• mechanika
• chemia
• stopień zanieczyszczenia
Z tych czynników można tworzyć różne konfiguracje,
które pomogą w osiągnięciu optymalnej skuteczności
czyszczenia. W zależności od metody czyszczenia
(stężenia środka, temperatury i czasu oddziaływania)
uszczelki ulegają w różnym stopniu uszkodzeniu. Może
to negatywnie wpływać na działanie urządzenia oraz
skracać jego żywotność.
Pasywacja
Przed rozruchem instalacji dokonuje się najczęściej
pasywacji długich przewodów rurowych i zbiorników.
Bloki zaworów zazwyczaj są z niej wyłączone.
Pasywację przeprowadza się najczęściej przy użyciu
kwasu azotowego (HNO
3
) o stężeniu 3% w temp. ok.
80°C (176°F). Czas kontaktu wynosi od 6 do 8 godzin.
Summary of Contents for DHV
Page 2: ...2016 01 Zawór stabilizacji ciśnienia DHV Constant pressure Valve DHV ...
Page 29: ......
Page 32: ......