GE Multilin
T35 Transformer Protection System
7-7
7 COMMANDS AND TARGETS
7.2 TARGETS
7
•
Description of problem
: Module hardware failure detected.
•
How often the test is performed
: Module dependent.
What to do
: Contact the factory and supply the failure code noted in the display. The “xxx” text identifies the failed module
(for example, F8L).
•
Latched target message
: No.
•
Description of problem
: A data item in a configurable GOOSE data set is not supported by the T35 order code.
•
How often the test is performed
: On power up
.
•
What to do
: Verify that all the items in the GOOSE data set are supported by the T35. The EnerVista UR Setup soft-
ware will list the valid items. An IEC61850 client will also show which nodes are available for the T35.
•
Latched target message
: No.
•
Description of problem
: A data item in a configurable report data set is not supported by the T35 order code.
•
How often the test is performed
: On power up
.
•
What to do
: Verify that all the items in the configurable report data set are supported by the T35. The EnerVista UR
Setup software will list the valid items. An IEC61850 client will also show which nodes are available for the T35.
•
Latched target message
: Yes.
•
Description of problem
: The battery is not functioning.
•
How often the test is performed
: The battery is monitored every five seconds. The error message displays after 60 sec-
onds if the problem persists
.
•
What to do
: Return the power supply module to GE Digital Energy for battery replacement. To instead dispose of the
battery and power supply module, see the battery disposal information at the beginning of this manual.
•
Latched target message
: No.
•
Description of problem
: Direct input and output settings are configured for a ring, but the connection is not in a ring.
•
How often the test is performed
: Every second
.
•
What to do
: Check direct input and output configuration and wiring.
•
Latched target message
: No.
•
Description of problem
: The Ethernet connection has failed for the specified port.
•
How often the test is performed
: Every five seconds.
•
What to do
: Check the Ethernet port connection on the switch.
IEC 61850 DATA SET:
LLN0 GOOSE# Error
IEC 61850 DATA SET:
LLN0 BR# Error
MAINTENANCE ALERT:
Replace Battery
MAINTENANCE ALERT:
Direct I/O Ring Break
MAINTENANCE ALERT:
ENET PORT # OFFLINE
Summary of Contents for T35 UR Series
Page 10: ...x T35 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 48: ...2 18 T35 Transformer Protection System GE Multilin 2 2 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2 ...
Page 314: ...5 192 T35 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 338: ...6 24 T35 Transformer Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 350: ...7 12 T35 Transformer Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Page 366: ...8 16 T35 Transformer Protection System GE Multilin 8 2 CYBERSENTRY 8 SECURITY 8 ...
Page 406: ...A 14 T35 Transformer Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 540: ...D 10 T35 Transformer Protection System GE Multilin D 1 IEC 60870 5 104 PROTOCOL APPENDIX D D ...
Page 552: ...E 12 T35 Transformer Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...
Page 560: ...F 8 T35 Transformer Protection System GE Multilin F 3 WARRANTY APPENDIX F F ...