GE M
EDICAL
S
YSTEMS
D
IRECTION
5184024-100, R
EVISION
5
LOGIQ
WORKS
® B
ASIC
S
ERVICE
M
ANUAL
Chapter 3 Installation
3-3
Section 3-2
Receiving and Unpacking the Equipment
3-2-1
Shipment Description
From the source factory all LOGIQworks parts are packed in the original packaging and put into a card-
board box.
3-2-1-1
Check of Delivered Box
1.) Check that cardboard box is undamaged as it was shipped.
2.) Check that they match the contents on the included Delivery Note.
3.) Check that each box is undamaged and unopened.
4.) Open each of these cardboard boxes.
5.) Check that contents are there and undamaged.
6.) Move the shipment to the place where it is to be installed.
7.) Unpack the Parts, run the check list shown below.
8.) Handling Incomplete or Damaged Shipment.
Please read that procedure before packing/unpacking the LOGIQworks.
User Manual(s):
Check that the correct User Manual(s) for the system and software revision is included with the
installation. Specific language versions of the User Manual may also be available. Check with your GE
Sales Representative for availability.
We strongly advise you to store the LOGIQworks packing material in undamaged condition in case of
future transportation.
CAUTION
Do not accept if damaged!