GE H
EALTHCARE
PROPRIETARY TO GE
D
IRECTION
5394227, 12
LOGIQ S8/LOGIQ E8 S
ERVICE
M
ANUAL
4 - 48
Section 4-5 - Application Turnover Check List
Section 4-5
Application Turnover Check List
Complete these checks before returning the scanner to the customer for use:
4-5-1
Software Configuration Checks
Section 4-6
Power supply test and adjustments
4-6-1
Power Supply Test Procedure
Run the System Voltage test. Refer to
4-6-2
Power Supply Adjustment
There are no adjustments on the power supplies. The DC Power is self-regulated. If a voltage is outside
the specified range, it means that something is wrong, either with the power supply itself or with a unit
connected to that specific power outlet.
Table 4-4
Software Configuration Checks
STEP
TASK
CHECK (
)
1.
Check Date and Time setting
2.
Check that Location (Hospital Name & Department) is
correct
3.
Check Language settings
4.
Check assignment of Printer Keys
P1
P2
P3
5.
Check that all of the customer’s options are correctly
installed
Summary of Contents for LOGIQ S8
Page 11: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL ix ZH CN KO...
Page 12: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL x...
Page 32: ...GE HEALTHCARE DIRECTION 5394227 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL 16...
Page 416: ...GE HEALTHCARE DIRECTION 5394227 REVISION 12 LOGIQ S8 LOGIQ E8 SERVICE MANUAL Index 4...
Page 417: ......