Section 3-1 - Overview
3-1-3
Average Installation Time
The LOGIQ A3 including options has been designed to be installed and checked out by an experienced
service technician in approximately
Four
hours.
NOTE:
For Installing Options average installation time is approximately between 0.5 - 2hrs depending
on the required configuration
3-1-4
Installation Warnings
1.) Since the LOGIQ A3 weighs approximately 70 kg without options, preferably two people should
unpack it. Two people are also preferable for installing any additional bulky items.
2.) There are no operator serviceable components. To prevent shock, do not remove any covers or
panels. Should problems or malfunctions occur, unplug the power cord. Only qualified service
personnel should carry out servicing and troubleshooting.
NOTE:
For information regarding packing labels, refer to LABELS ON PACKAGE.
3.) After being transported, the unit may be very cold or hot. If this is the case, allow the unit to
acclimate before you turn it on. It requires one hour for each 2.5
o
C increment in it's temperature, if
it is below 10
o
C or above 40
o
C.
Table 3-2
Average Installation Time
Description
Average Installation Time
Comments
Unpacking the scanner
Approximately 0.5 hour
Scanner wo/options
Approximately 0.5 hour
Dependant on the required configuration
CAUTION
Equipment damage possibility. Turning the system on without acclimation after arriving at site
may cause the system to be damaged
°
C
60
55
50
45
40
35
30
25
20
15
10
5
0
-5
-10
-15
-20
-25
-30
-35
-40
°
F
140
131
122
113
104
96
86
77
68
59
50
41
32
23
14
5
-4
-13
-22
-31
-40
hrs
8
6
4
2
0
0
0
0
0
0
0
2
4
6
8
10
12
14
16
18
20
Table 3-3
Time for Settlement
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.