GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
Chapter 10
10-1
Chapter 10Care & Maintenance
Section 10-1Overview
10-1-1
Periodic Maintenance Inspection
It has been determined by engineering that your LOGIQ™ A3 system does not have any high wear
components that fail with use, therefore no Periodic Maintenance Inspections are mandatory. Some
Customers Quality Assurance Programs may require additional tasks and or inspections at a different
frequency than listed in this manual.
10-1-2
Purpose
This chapter describes
Care & Maintenance
(PM) on the scanner and its peripherals. These PM
procedures are intended to maintain the quality of the ultrasound systems performance. Read this
chapter completely and familiarize yourself with the procedures before starting a PM.
10-1-3
Table Of Contents
Table 10-1 Contents in Chapter 10
S.No
Description
Page Number
1
2
3
4
5
6
7
When There's Too Much Leakage Current...
8
PM Inspection Certificate
CAUTION
Practice good ESD prevention. Wear an anti–static strap when handling electronic parts and
even when disconnecting/connecting cables.
DANGER
THERE ARE SEVERAL PLACES ON THE BACKPLANE, THE DC DISTRIBUTION
IS DANGEROUS. BE SURE TO DISCONNECT THE SYSTEM POWER PLUG AND
OPEN THE MAIN CIRCUIT BREAKER BEFORE YOU REMOVE ANY PARTS. BE
CAUTIOUS WHENEVER POWER IS STILL ON AND COVERS ARE REMOVED.
CAUTION
Do not pull out or insert circuit boards while power is ON.
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 224 of 252