GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
Chapter 8
8-3
8-2-1 LCD ASSEMBLY(FRU P/N # 5271538)
5.) Unscrew the two screws (A, B) in
6.) Lift the LCD Assembly upward to remove it from the system.
NOTE:
Please angle the LCD while lifting LCD Assembly upward to remove it from the system. If LCD
Assembly remove with out angling it may damage or break the LCD Cover.
Figure 8-3 Remove LCD Assembly
8-2-1-5
Mounting Procedure
1.) Install new LCD Assembly and fix two screws (A, B). Refer
2.) Re connect Power and Signal Cables. Refer
3.) Put back LCD arm cover and fix the two screws (5, 6). Refer
4.) Replace LCD rear cover by fixing the four screws (1, 2, 3, and 4). Refer
8-2-1-6
Functional Checkout Procedure
See Section
Functional and/or
Leakage Current
Test
Debrief Script
Service Manual Direction 5213326-100, Rev 3, Section 8-2-1. Equipment passes all
required tests and is ready for use.
Basic Controls
B- Mode Checks
M-Mode Checks
Measurement Check
Service Diagnostics
A
B
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 152 of 252